North Narrabeen Surf Life Saving Club Extension: Update + only One NSW WSL Event in 2025
Council made available for feedback a proposal for alterations and additions at North Narrabeen SLSC in April 2023.
The proposed upgrade works comprise a minor extension to provide a suitable meeting space for the NNBC and other building improvements that include alterations to:
- improve accessibility
- provide upgraded facilities - including an enclosed space on the first floor deck
- fix waterproofing of the first-floor deck, and
- provide a general upgrade to the building to improve community and member use of the space.
The proposed works are planned to be carried out in three (3) stages:
Stage 1 – Boardriders room, BBQ area renewal and associated landscaping works (GF) and slab extension (L1).
Stage 2 – Internal refurbishment with new ceiling, lighting, flooring (L1).
Stage 3 – Decking renewal and waterproofing works, new enclosed space, balustrades and cladding (L1).
The project aims to provide a new meeting room for the North Narrabeen Boardriders Club to meet their operational needs, address the failure of the waterproofing of the first floor slab and generally improve the facility for members and the community.
The total project cost including professional fees, authority fees and staff costs is estimated to be in the order of $2.85M.
Stage 1 - $780K
Stage 2 - $135K
Stage 3 - $1.95M
The works are proposed to be funded through Council Capital Works programs and grant applications.
Proposed alterations and additions, concept drawing. Sketch: NBC
- improve accessibility
- provide upgraded facilities - including an enclosed space on the first floor deck
- fix waterproofing of the first floor deck, and
- provide a general upgrade to the building to improve community and member use of the space.
- Stage 1 – Boardriders room, BBQ area renewal and associated landscaping works (GF) and slab extension (L1).
- Stage 2 – Internal refurbishment with new ceiling, lighting, flooring (L1).
- Stage 3 – Decking renewal and waterproofing works, new enclosed space, balustrades and cladding (L1).
No Manly to Barrenjoey WSL event in 2025
- North Narrabeen Surf Life Saving Club: Proposed alterations and extensions (April 2023 editions)
- Surf Club Facility Program 2024 Allocations are Great News for North Narrabeen, Mona Vale, South Curl Curl (May 2024 Editions)
- Jordan Lawler Wins 2024 World Surf League GWM Sydney Surf Pro.! ( May 2024 editions)